Design & Construction

Personal

Main Page

Construction - June

 

June 30 - Roof and window work

A dining room window disassembled

Great room doors

 

June 27 - The start of the roof

 

June 26 - Loading up the house

Tar paper on the roof

Drywall in the house

LED can lights in the kitchen

Sloping the deck for drainage

 

 

 

June 19 - Soffits and other stuff

The main entry way. Note where the air return was going to be. Fortunately it got moved.

Kitchen soffits

The upstairs tub from downstairs

Master shower has been hot mopped

Garage soffits

 

June 3-12 - HVAC and other work

Air return for furnace

The back deck

Furnace in the attic space

Upstairs tub goes in

Solar water heater

 

Whole house fan